Appendix ‘C’

 

 

MBA

 

SPECIFIC NORMS AND STANDARDS FOR INITIAL (FIRST YEAR) AFFILIATION OF MASTER OF BUSINESS ADMINISTRATION (MBA) INSTITUTION/ PROGRAMMES

 

S.No.

Parameters

Norms & Standards for the First Year of Institution

Remarks for Use of the Board of Affiliation

1

Teaching Staff (for a class of 60 or less students)

-          5 core full-time faculty in general and functional area

-          Part-time/visiting faculty for about 30 hours per week

 

·         Principal should have been appointed/ identified

·         There should be at least one Professor and one Reader amongst the teaching staff

·         Remaining staff may be Lecturers

·         All staff to have qualifications and experience as prescribed by the AICTE

·         Visiting faculty should be from industry

 

2

Technical supporting staff

2

·         To be appointed in the scale of Senior Technical Assistant as per Vishwavidyalaya prescribed Q&E

·         To be skilled in maintenance and care of audio-visual and reprographic equipment

 

3

Library Staff

-          One Assistant Librarian

-          One Library Assistant

Assistant Librarian and Library Assistant to be appointed as per Q & E and in pay scale as prescribed by the Vishwavidyalaya

 

4

Computer Center Staff

-          One System Analyst

-          One Programmer

-          2 Computer Operators

·         System Analyst to be of Assistant Professor rank

·         Rank and Q&E of programmer and computer operator to be prescribed

 


5

Administrative Staff

 

-          1 Administrative Officer

-          1 Office Superintendent

       & adequate office/allied staff

·         Institutions may have contracted security and housekeeping services for academic and administration areas.

·         Hostels should also be provided with contracted security and housekeeping services.

·         Hostels with kitchen should have cooks and other kitchen and dining room staff. Cooking and dining room services may also be contracted, perhaps to the group managing the canteen in theInstitution.

 

6

Land Area

·         Within DDA/MCD limits

 

·        Outside DDA/MCD limits

 

·        Rural

 

 

 

0.50 acres

 

1.25 acres

 

 

 

2.5 acres

 

 

Total land area  for permanent site of the Institution required should be in clear possession of the Society and should  be in a single plot.

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Built Space (Academic)

 

a)       Class Rooms

 

 

Carpet area @ 1.3 sqm carpet area per student both for class rooms and syndicate/tutorial rooms

·         There should be one classroom and 4 syndicate/tutorial rooms.

·         The distance between the blackboard and the first row of students should not be less than 3 meters (about 10 ft).

·         Blackboards should be of adequate size and of good quality (made of glass or plastic coated)

·         Lighting and fans should be adequate and in working condition.

·         Audio-visual equipment such as OHP, slide projector, TV, VCP/VCR, VCD player, etc. should be permanently installed in the classroom.

b)       Central Library

100 sqm carpet area

 

·         Reading room and stack area should be separated from each other

·         Lighting and fans should be adequate and in working condition.

 

c)       Computer Centre

 

100 sqm carpet area

·         There should be glass cabin for computer center staff.

·         The Center should be well lighted and air- conditioned.

·         UPS should be located outside the Center.

8

Built Space  (carpet area in sqm) for (Teaching Staff & Administrative Offices) 

 

Faculty Rooms

 

 

 

 

10 each

 

 

 

There should one room each for full-time faculty and one room for the visiting faculty.

·         Director & Director’s Office

 

30

 

·         Administrative Offices

 

Reception

 

Main Office

 

Strong Room

 

Reprography Room

 

Stores

 

 

25

 

60

 

20

 

10

 

20

 

·         Conference Hall

100

 

9

Built Space (carpet area in sqm) for Amenities

 

·         Toilets

 

 

 

10 sqm per 120 students

 

There are to be separate toilets for male and female students with appropriate facilities and disposal facilities.

 

·         Canteen

100 sqm carpet area

 

 

·         Retiring room for female students

25 sqm carpet area with appropriate furniture and attached toilet of 10 sqm

 

10

Built Space for Hostels (carpet area in sqm)

 

Capacity

 

 

Residential room sizes

 

 

 

Kitchen with stores & Dining Hall

 

Medical Room

 

Warden Office

 

Toilets

 

 

 

 

25% for boys and 50% of girl students

 

Double seated rooms of 15 sqm each for First Year students

 

50 sqm area in boys hostel

40 sqm area in girls hostel

 

15 sqm in each hostel

 

15 sqm

 

25 sqm in each hostel

 

 

 

 

Requirement of hostel desirable

11

Built Space for Residences (carpet area in sqm)

 

        Director

 

        Wardens

 

 

 

 

 

140 sqm

 

80 sqm

 

 

 

·         There should be 2 warden residences in the vicinity of the hostels

·         Additional residences are to be provided from the Second Year onward

12

Books, Computing Facilities, Lab & Workshop Equipment, Audio-visual Equipment and Reprographic Facilities

 

·         Books

 

Technical

 

 

       Reference & General   

       Interest

 

·         Technical Journals

 

 

 

 

 

 

 

 

 

 

100 titles in each subject taught; each title with 2 copies

 

500 volumes

 

 

15 journals needed during the First Year

 

 

 

 

 

 

 

·         Books should be relevant to the subjects taught

·         The must be of recent editions and good print quality

·         All relevant reference and handbooks should be available.

·         There should be books and magazines of general interest reading.

·         Computer Center facilities

-          15 PCs

-          2 DMPs with sharer

-          1 Laser Printer with sharer

-          CAL Packages

-          Internet with leased line

-          UPS to allow use of PCs for at least 15 minutes

-          Software as per curriculum

·         PCs should be of the latest configuration

·         Software must be multi-user licensed versions

·         UPS should be placed outside the computer center

·         Audio-visual equipment & materials

-          1 OHP

-          1 TV

-          1 VCP/VCR

-          1 VCD Player

-          1 Slide Projector

-          1 Computer-linked projection system

-          Cassettes and CDs

 

 

·         Reprographic Facilities

 

-          High capacity photocopier